GF5000A 1 Cubic Meter Crawler Concrete Mixer Truck 37kW Yunnei 490 Engine Self Loading Site Dumper
1 cubic meter concrete mixer crawler
,self loading mixer dumper
,37kW crawler concrete carrier
Mixing where the mixer truck cannot park
Concrete is a perishable product. Once water meets cement, the clock runs — usually less than ninety minutes before workability falls away. That is why the last kilometre is the hardest part of any pour: the road ends, the pump cannot get closer, and the wheelbarrow relay starts eating time. The GF5000A removes that last kilometre by putting a one-cubic-metre mixing drum on a crawler chassis, so the batch is mixed and delivered right at the formwork.
The machine in one paragraph
A 3750 x 1650 x 2270 mm crawler chassis with 400 x 90 x 62 rubber tracks, an 800/1600 mm track gauge for stability, and a hydraulic drive system that climbs 35 degree grades. On top sits a 2550 x 1290 x 1000 mm mixing drum rated at 1 m3, driven from a Yunnei 490T four-cylinder diesel producing 37 kW through a 28 model gearbox with 3 forward speeds and 1 reverse.
Why mixing on site beats delivered concrete here
- Time. Batching happens at the work face, so the mix arrives at full workability instead of losing it during the haul.
- Access. Tracks and a 1650 mm body width reach foundations behind buildings, terrace walls, canal linings and highland field edges where no truck can reverse.
- Waste. Order 1 m3, pour 1 m3. There are no part-loads rejected, no returned concrete and no over-order on small pours.
- Cost. On sites without a batching plant, buying cement, sand, stone and lime separately and mixing in the drum avoids premium prices for ready-mix delivery to remote locations.
Indicative batch mixes per drum (1 m3)
| Target strength | Cement | Sand | Coarse aggregate |
|---|---|---|---|
| C15 non-structural | 200 kg | 0.50 m3 | 0.85 m3 |
| C20 general | 250 kg | 0.48 m3 | 0.84 m3 |
| C25 reinforced | 310 kg | 0.45 m3 | 0.82 m3 |
| C30 structural | 370 kg | 0.43 m3 | 0.80 m3 |
Exact ratios depend on aggregate grading, moisture content and the local cement grade; the figures above are a starting point for site trials, not a substitute for a mix design.
Where it earns money
- Water conservancy projects — canal linings, check dams and sluice repairs along embankments.
- High-standard farmland renovation — field roads, drainage structures and small bridges.
- Foundation works — house and boundary-wall footings in dense urban plots with no truck access.
- Mining sites — shotcrete support pads, drainage channels and equipment plinths.
- Rural construction — one-pour jobs where the nearest batching plant is two hours away.
Technical data
| Item | Data |
|---|---|
| Overall size | 3750 x 1650 x 2270 mm |
| Drum size | 2550 x 1290 x 1000 mm |
| Rated volume | 1 m3 |
| Engine | Yunnei 490T, 37 kW |
| Gearbox | 28 model, 3 + 1 |
| Rubber track | 400 x 90 x 62 |
| Travel speed | 1-15 km/h |
| Machine weight | 2800 kg |
| Climbing angle | 35 degrees |
| Track gauge inner / outer | 800 / 1600 mm |
| Clutch | Mechanical clutch device |
Operating advice from the field
Wash the drum at the end of every shift, not every week — set concrete inside a drum is a two-day repair. Keep the water tank topped up for wash-down. Load aggregate before cement so the blades cut through the pile rather than smothering it, and do not exceed the rated 1 m3, because overloading a drum is the fastest way to burn a drive coupling.
Tell us your pour size, aggregate type and site access, and we will quote the mixer configuration, spare wear parts and shipping to your port.
Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.